Any change after confirmation must be reviewed and may affect cost and lead time.
timeTue, 26 May 2026 15:08:46 GMT
Slight color variation between dye lots is a normal industry occurrence. However, we minimize this through strict dye lot control, batch matching, and pre-production color approval.Whenever possible, production for the same order is completed using the same dye lot to ensure consistency.
timeTue, 26 May 2026 15:08:26 GMT
Any quality issues are evaluated case-by-case, and solutions may include repair, replacement, or compensation depending on the situation.
timeTue, 26 May 2026 15:07:55 GMT
We follow international AQL inspection standards for bulk production.
timeTue, 26 May 2026 15:07:19 GMT
We apply multi-stage quality control including fabric inspection, in-line inspection, semi-finished inspection, and final inspection before shipment.
timeTue, 26 May 2026 15:06:47 GMT
Standard production lead time is 60–90 days depending on order quantity and complexity. In addition, the overall timeline may also be influenced by material availability, fabric or accessory lead times, and the speed of customer confirmation on grading samples and pre-production samples. Once all materials and approvals are confirmed, we can better define a more precise production schedule for eac...
timeTue, 26 May 2026 15:06:22 GMT
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.