A spec sheet describes the product, a tech pack describes how to make it. A spec sheet lists measurements, materials and colours. A tech pack adds the construction detail a line needs: seam types, stitch density, cup construction, elastic tension, labelling position, packing method and the acceptance standard.A spec sheet is enough to quote from. It is not enough to produce from, and the gap betwe...
timeTue, 03 Nov 2026 11:08:12 GMT
That has to be written into the contract rather than assumed. Our standard term is that once development is paid for, the patterns and the tech pack belong to the buyer, and we do not reproduce them for another customer.Put the sentence in the purchase order as well as in the development agreement. Ownership that only exists in an email thread is ownership you will have to argue about later.
timeTue, 03 Nov 2026 11:08:11 GMT
With a complete tech pack, pattern making and grading are fast, and the constraint is the first sample, which we run in about seven days. A sales sample for a confirmed style takes two to three weeks. Bulk then runs 60 to 90 days depending on fabric lead time and line capacity.With an incomplete tech pack you add a rebuild round before sampling can start. That is the single most common cause of a ...
timeTue, 03 Nov 2026 11:08:09 GMT
Yes, through reverse development. We deconstruct the reference sample, digitise the pattern, build the first prototype and then write the tech pack from what the prototype proves: consumption, construction, seam types and grade rules.It normally takes two to three sample rounds, because a photograph does not tell you what the inside of the garment does. The tech pack that comes out of it belongs t...
timeTue, 03 Nov 2026 11:08:07 GMT
Eight sections. Flat and construction sketches. A point-of-measure table with grade rules for every size in the range. A fabric and trim BOM with supplier references. Cup and wire specification. Seam and stitch types. Label and care instructions. Packing and carton details. And the acceptance standard, meaning the AQL level and the list of critical defects.The part most often missing is grading. A...
timeTue, 03 Nov 2026 11:08:05 GMT
A tech pack is the document that tells a factory how to make one style: flat sketches and construction details, a measurement table with grading rules, a bill of materials, seam and stitch instructions, labelling, packing and the acceptance standard.Without one, a factory does not quote your product, it quotes its guess at your product. That guess is where the price gap between two quotes usually ...
timeTue, 03 Nov 2026 11:08:04 GMT
Five that recur. A first reply that answers price but ignores the construction questions. Refusal to show the cutting room or the pattern room. A quote with no validity period. Unwillingness to accept an inspection clause with a stated AQL level. And any request to pay into a personal account.None of these is proof of fraud on its own. Together they describe a supplier who cannot show you how the ...
timeTue, 03 Nov 2026 11:08:02 GMT
Thirty percent deposit with the balance against the bill of lading copy is the common structure. It moves with order size and with whether the fabric has to be specially dyed, but the shape stays the same: money follows evidence of progress.Two protections matter more than the percentage. The beneficiary name must match the business licence exactly, and it must be a company account rather than a p...
timeTue, 03 Nov 2026 11:08:00 GMT
Take the certificate number and the holder name and check them at the issuing body, not at the factory. OEKO-TEX certificates can be looked up in the OEKO-TEX public label database, and BSCI audit reports are verified through the amfori platform against the auditee ID.Check the scope as well as the validity. A certificate may cover certain product classes or certain production sites and not others...
timeTue, 03 Nov 2026 11:07:58 GMT
Four stops cover most of it. The cutting room, where fabric rolls and lay height tell you the order sizes they really run. The sewing floor, where you count stations and look at what is actually in progress. The pattern and sample room, which is where a factory's development capability lives. And the finished goods area, where packing and carton marking show what the export process really looks li...
timeTue, 03 Nov 2026 11:07:57 GMT
Ask for a live video walk-through rather than a recorded tour. Look for three things: a cutting room with fabric rolls, cutting tables and markers; work in progress at every station on the line; and the actual number of operators present. Ask the camera to show the factory gate and the business licence on the wall.A trading company can show you a showroom, a catalogue and a sample room. It cannot ...
timeTue, 03 Nov 2026 11:07:55 GMT
Ask for the business licence, the most recent social compliance audit report with its date and the auditing body, the ISO 9001 certificate, and the OEKO-TEX 100 certificate number so you can check it in the public database yourself.Then ask for two things that are harder to fake: production and shipment records for the last three months, and the contact details of two existing customers in your ma...
timeTue, 03 Nov 2026 11:07:53 GMT
Put both quotes against one document: the same tech pack, the same size range, the same quantity per colour, the same Incoterm and the same payment terms. Then ask each factory to state what is included and what is excluded.The quote that survives that comparison is the comparable one. Two numbers on two different scopes are not a price difference, they are two different products.
timeTue, 03 Nov 2026 11:07:51 GMT
Samples are charged, and the charge covers fabric, trims and the line time taken off production. Development from a sketch or a reference sample, meaning pattern making, grading and the first prototype, is quoted separately because it is engineering work rather than sampling.Sampling itself runs about seven days, and a sales sample for a confirmed style takes two to three weeks. Sample charges are...
timeTue, 03 Nov 2026 11:07:49 GMT
Yes, but not in a straight line. Three things drive the curve: fabric minimums and dye-lot batching, how many pieces can be cut from one lay, and the changeover time the style costs a line. Small runs are dominated by changeover, large runs by material.Our minimum is 1,000 to 3,000 pieces per style per colour depending on fabric and construction, which is the band where the six cost blocks become ...
timeTue, 03 Nov 2026 11:07:47 GMT
The costs easiest to leave out are testing (colourfastness, fibre composition, OEKO-TEX 100), packaging (polybag, hangtag, carton), third-party inspection, pattern and grading development, and inland freight to the port. Each of those is a real cost that has to land somewhere, either in the unit price now or in a supplement later.Ask for the quote in writing with the exclusions listed. A factory t...
timeTue, 03 Nov 2026 11:07:45 GMT
Four things usually differ, and only one of them is price. The fabric actually specified may not match on weight, composition or stretch recovery. The construction may be different. What the quote includes may differ, because testing, packaging, inland freight and export documents are often left out by one side and included by the other. And the two factories probably assumed different order quant...
timeTue, 03 Nov 2026 11:07:44 GMT
An FOB price is built from six blocks, and no factory prices a bra by weight. The blocks are fabric, trims, cutting and sewing labour, packaging, testing and wastage, and factory overhead plus margin. Fabric and labour together usually account for 60 to 70 percent of the unit price.What you can actually influence at quotation stage is fabric consumption per piece, how many separate trim components...
timeTue, 03 Nov 2026 11:07:42 GMT
Our products are exported to a wide range of international markets, with long-term clients across many European countries, including Germany, France, Spain, Poland, Russia, and more.We also work with customers in Australia and New Zealand, North and South America, as well as selected markets in the Middle East. Our broad export experience helps us better understand different market preferences, si...
timeTue, 26 May 2026 15:14:31 GMT
We regularly participate in major industry trade shows, including the Canton Fair, subject to booth availability and application approval.Our upcoming exhibition schedule and booth information will be announced in advance on our website. We warmly welcome you to contact us and arrange a meeting in person during the show.
timeTue, 26 May 2026 15:13:45 GMT
Yes. We work with brands for long-term development, seasonal collections, and continuous product updates.
timeTue, 26 May 2026 15:13:22 GMT
We accept TT and other mutually agreed payment terms.
timeTue, 26 May 2026 15:13:01 GMT
We hold several internationally recognized certifications, including ISO, OEKO-TEX® Standard 100, GRS (Global Recycled Standard), and BSCI.These certifications reflect our commitment to quality management, product safety, sustainable practices, and social responsibility. Relevant certificates can be provided upon request.
timeTue, 26 May 2026 15:12:28 GMT
Yes. Third-party inspections or client-appointed inspectors are supported.
timeTue, 26 May 2026 15:12:00 GMT
Yes. We provide full export documentation including invoices, packing lists, and required certificates.
timeTue, 26 May 2026 15:11:39 GMT
Yes. We ship worldwide by sea, air, and express depending on client requirements.
timeTue, 26 May 2026 15:11:02 GMT
Yes. We offer full packaging customization including hanger, boxes, hangtags, polybags, and other branding elements.
timeTue, 26 May 2026 15:10:40 GMT
Pricing depends on fabric cost, construction complexity, order quantity, and customization requirements.
timeTue, 26 May 2026 15:10:02 GMT
Yes. Small trial orders may be supported depending on product type and production structure.
timeTue, 26 May 2026 15:09:37 GMT
MOQ depends on fabric and design complexity, typically ranging from 1000 to 3000 pieces per style per color.
timeTue, 26 May 2026 15:09:14 GMT
Any change after confirmation must be reviewed and may affect cost and lead time.
timeTue, 26 May 2026 15:08:46 GMT
Slight color variation between dye lots is a normal industry occurrence. However, we minimize this through strict dye lot control, batch matching, and pre-production color approval.Whenever possible, production for the same order is completed using the same dye lot to ensure consistency.
timeTue, 26 May 2026 15:08:26 GMT
Any quality issues are evaluated case-by-case, and solutions may include repair, replacement, or compensation depending on the situation.
timeTue, 26 May 2026 15:07:55 GMT
We follow international AQL inspection standards for bulk production.
timeTue, 26 May 2026 15:07:19 GMT
We apply multi-stage quality control including fabric inspection, in-line inspection, semi-finished inspection, and final inspection before shipment.
timeTue, 26 May 2026 15:06:47 GMT
Standard production lead time is 60–90 days depending on order quantity and complexity. In addition, the overall timeline may also be influenced by material availability, fabric or accessory lead times, and the speed of customer confirmation on grading samples and pre-production samples. Once all materials and approvals are confirmed, we can better define a more precise production schedule for eac...
timeTue, 26 May 2026 15:06:22 GMT
Yes. Sampling and bulk production follow the same technical system to ensure consistency.
timeTue, 26 May 2026 15:05:47 GMT
Yes. We provide sample revision based on client feedback until approval is confirmed.
timeTue, 26 May 2026 15:05:15 GMT
Sampling typically takes 2-3 weeks depending on design complexity and material availability.
timeTue, 26 May 2026 15:04:40 GMT
Yes, size grading can be developed based on EU, US, UK, or custom sizing systems.
timeTue, 26 May 2026 15:04:03 GMT
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2026 Tradevv.com. All rights reserved.